Buying pre-construction means buying a promise. These are the documents and clauses that turn that promise into something you can enforce.

Pre-constructionEquipo CondesaRomaRedacción · CondesaRomaUpdated 9 min read
Share

The pre-construction discount exists because you are financing the build. The risk is controlled by checking four documents and three clauses before you put down a deposit, and none of them requires being a lawyer to ask for.

In Condesa and Roma, where there is almost no vacant land and new construction is scarce, pre-construction is often the only way to buy something new. That is why it pays to know exactly what to ask for.

The documents to ask for

A serious developer has them on hand and shows them without being asked twice. If one does not exist yet, ask on what date it will, and get the answer in writing.

Zoning certificate (uso de suelo)SEDUVI, the city's urban development agencyThat the land allows housing and the number of floors being sold.
Construction permit (manifestación de construcción)The borough (alcaldía)That the building is authorized to be built as offered.
Deed and lien certificatePublic Property RegistryWho owns the land and whether it is mortgaged.
Registered adhesion contractProfecoThat the contract meets the standard for selling housing.
Trust or project accountTrustee bankThat your payments go to the build and nothing else.

Zoning and the construction permit

Mexico City does not issue a building license as such; the permit is the manifestación de construcción, registered with the borough. Ask for its number and folio, and compare what it authorizes (floors, number of units, parking spaces) with what you are being sold.

A project that sells before it has that permit is a project that can still change its number of floors, its delivery date, or whether it exists at all. In Condesa, much of the neighborhood is also a heritage conservation area, and permits take longer.

The lien certificate

It tells you whether the land is mortgaged and to whom. A bridge loan financing the build is normal; what is not normal is a developer who does not want to show it to you.

If there is a bridge loan, the contract has to say that your apartment is released from the mortgage when the deed is signed. If it does not say so, ask for it to be added.

The contract: Profeco and the delay penalty

The sale of new housing is regulated by Profeco, Mexico's consumer protection agency, under the standard for marketing residential property. It requires the adhesion contract to be registered and the developer to disclose prices, timelines, features and penalties in writing. Ask for the registration number and look it up.

The contract has to set a delivery date and a penalty for each month of delay. Without that clause, a two-year delay entitles you to nothing. It is the most fought-over point in pre-construction and the one most often signed unread.

  • A specific delivery date, not an “approximate” one or one “subject to construction progress.”
  • A monthly delay penalty, expressed as a percentage of what you have paid.
  • The right to cancel with a refund if the delay goes past a set period.
  • Finish specifications in an annex, with brands or equivalents.
  • Private floor area in square meters and the maximum tolerance for differences.

Where your money goes

The safest setup is for payments to go into a trust or an account in the project's name. That way, if the developer runs into trouble, the money stays tied to the build. Be wary of any arrangement that asks you to deposit to an individual.

The most common payment plans in the area look like this; the more you pay up front, the bigger the discount:

Cash100% at signing——
Half and half30%20% in monthly installments50% with a mortgage or your own funds
Low down payment10% – 20%10% – 20% in monthly installments60% – 80% with a mortgage

Assignment of rights

This is the emergency exit: being able to sell your contract before delivery (cesión de derechos). Check that it is allowed and what the developer charges to do it, usually between 1% and 3%. Some only allow it once the project has sold a certain percentage.

Get to know the developer

The paperwork says what can be built; the track record says whether it will be built on time.

  • Visit at least one project they have already delivered and talk to someone who lives there.
  • Look for complaints in Profeco's Buró Comercial and in public court records.
  • Ask how many projects they have under construction at the same time.
  • Check the actual progress of the build against the schedule they show you.

How to verify the contract registration

The standard that governs the sale of housing is NOM-247-SE-2021, published in March 2022. Among other things, it requires the developer to register its model adhesion contract with Profeco, and the Ministry of Economy warns that contracts that do not meet the standard are not valid.

The registration has a number and can be looked up in Profeco's online catalog of registered contracts. Compare the registered model with the one you are given to sign: same company, same clauses. If you are told the registration is “in process,” get the date in writing and do not sign a different contract in the meantime.

Common mistakes when buying pre-construction

Almost every pre-construction problem could have been spotted before signing. These are the ones that come up most:

  • Putting down the deposit before seeing the documents, under pressure that “only a few units are left.”
  • Signing off a rendering with no floor plans: ask for the unit's plan with measurements and its location in the building.
  • Accepting “luxury finishes” without an annex: if it is not written down with brands or equivalents, any finish complies.
  • Not planning the final payment: the 50% to 80% due at delivery arrives all at once, and the bank approves the mortgage based on your situation at that moment, not today's.
  • Forgetting closing costs, which are paid at delivery and add up to 5.5% to 7% of the value.
  • Paying into a personal account or in cash, with no receipt tying the payment to the contract.

Delivery and the deed

When the apartment is finished, you sign a handover certificate (acta de entrega-recepción). Before signing it, walk the apartment with the finishes annex in hand: measure, test faucets, outlets, doors and windows, and look for damp. Anything that is not right goes into the certificate with a committed date to fix it.

The deed is signed before a notary, with the same costs as any purchase: acquisition tax, notary fees, appraisal, certificates and registration. The breakdown is in buying an apartment in Condesa or Roma. The tax is calculated on the highest of the price, the cadastral value and the appraisal, so budget for it on the delivery value, not on the discounted price you paid.

If you are a foreigner, you can take title in your own name without a bank trust, because Mexico City is outside the restricted zone; what you need is the agreement with the Ministry of Foreign Affairs, the Calvo clause, filed before signing. Either way, pay by wire transfer: the anti-money-laundering law prohibits paying for real estate in cash at or above 8,025 UMA, about $941,000 MXN in 2026.

How much you gain buying pre-construction

With a 15% discount, an apartment that will be delivered at $6,000,000 MXN is bought pre-construction for about $5,100,000. That difference is the gain if everything goes on time, and also the cushion that absorbs a delay or a shift in the market.

If you are comparing projects, look at the pre-construction apartments in Condesa and in Roma, and compare their price per square meter with resale in the price per square meter guide.

Frequently asked questions

Is it safe to buy pre-construction?

It is safe when the project has its zoning certificate and construction permit, the land is free of liens or has a clear bridge loan, the contract is registered with Profeco and your payments go into a trust or project account.

How big is the pre-construction discount?

Usually between 10% and 20% against the delivery price. The discount is larger in the early stages, when the construction risk is also larger.

What happens if the developer delivers late?

It depends on the contract. If it has a penalty clause for delay, the developer pays you a percentage for each month. If it does not, a delay entitles you to no compensation, which is why it is the most important clause.

Can I sell my apartment before it is delivered?

Yes, through an assignment of rights, if the contract allows it. The developer usually charges between 1% and 3% of the value to authorize it.

Can I buy pre-construction with a mortgage?

Yes, but the mortgage is drawn at delivery, when the apartment exists and the deed can be signed. During construction you pay with your own funds.

What is the manifestación de construcción?

It is the registration that authorizes a building project in Mexico City, filed with the borough. It states how many floors, units and parking spaces can be built.

How do I know whether a pre-construction contract is registered with Profeco?

Ask the developer for the registration number and look it up in Profeco's online catalog of adhesion contracts. The registered model has to be the same one you sign.

Can a foreigner buy pre-construction in Mexico City?

Yes, and they can take title in their own name without a bank trust, because the city is outside the restricted zone. Before the deed, they file the Calvo clause agreement with the Ministry of Foreign Affairs.

Equipo CondesaRomaWe write about the 22 neighborhoods we cover, with the prices we see come through the site every day.

Keep reading

CondesaRoma alert

We'll tell you about what gets listed around here

If you're looking around here, leave your email and we'll write when something that fits comes in.

One alert, no spam, unsubscribe whenever you want.