condesaroma
Pre-constructionVerified advertiser

Apartment pre-construction at Augusto Rodin 14, Ampliación Nápoles, 2 bedrooms

Augusto Rodin 14 · Ampliación Nápoles, Benito Juárez, ZIP 03810

Size63 m²
Bedrooms2
Bathrooms2
Parking1 space
FurnishedNo
PetsYes

About this apartment

Rodin 14 is 36 two- and three-bedroom apartments by Bloqe on a quiet residential street in Nápoles, a 15-minute walk from the World Trade Center. Travertine marble, grey concrete, oak-look wood and stainless steel, with balconies and, on the upper floors, a roof garden with a study.

Two-bedroom, two-bathroom apartments. Unit 103, on the ground floor, has 63 m² inside and a 39 m² terrace; units 206 and 302 have 76 m² inside with a balcony.

From $6,418,620 MXN. 3 units available:

• 103 PB with terrace: 101.75 m² total, $6,418,620 MXN

• 206: 85.29 m² total, $6,440,800 MXN

• 302: 87.05 m² total, $6,544,000 MXN

Estimated delivery in 2028. Payment plans: 30/10/60 (30% down, 10% over 24 monthly payments and 60% at closing), 50/10/40 and 70/30. Prices and availability subject to change.

On foot: World Trade Center 15 min.

What buying it costs

Price
$6,418,620
Closing costs (estimate)
$321,000 – $513,000
Approximate total
$6,740,000 – $6,932,000

The estimate is 5% to 8% of the price and covers the acquisition tax (ISAI), the notary's fees, the appraisal and recording at the Public Registry. It goes up if you buy with a mortgage.

Price per m² against Ampliacion Napoles

It is 6% above the neighborhood average.

This property$101,883/m²
Average for pre-construction in Ampliacion Napoles$95,681/m²

Compared with what is listed in the neighborhood today

What it comes with

  • Terrace
  • Balcony
  • Storage unit
  • Pet friendly

Where it is

Augusto Rodin 14 · Ampliación Nápoles, Benito Juárez, ZIP 03810

Street address in Ampliacion Napoles, Benito Juárez.

Bloqe
BloqeDeveloper · verified

We check that every listing is inside the neighborhoods we cover. Before paying any deposit, visit the property and ask for its documents.

Questions about this property

What happens if the project is delayed?

The contract should set a delivery date and a penalty for every month of delay. Ask for that clause in writing.

Can I sell before delivery?

Through an assignment of rights, if the contract allows it. It usually costs 1% to 3%.

Similar ones in Ampliacion Napoles

Listed 7 days ago · updated November 12, 2026 · reference CR-FD3F

$6,418,620
WhatsApp